asphalt mixing plant equipment

Mini Asphalt Plants For Sale

Mini asphalt plants for sale has mini land occupation, mini productivity, which is much more well suited to produce batch asphalt for urban roads, expressway, port, airport, etc. We mainly have three types mini asphalt plants for sale.

Mini Hot Mix Asphalt Plant – – Produce High-Quality Asphalt

This type asphlt plant can produce quality asphalt, can prolong the service life of your construction needs. Because there is a heat device, aslo named drying drum, when raw materials through it will be heated, it will remove the moisture from materials, which can improve the purity of raw materials, do you know what raw materials? We usually use pebble, mineral powder and sand, if there are any special requirements, you can contact us, we can give you professional advice. We mainly have mini hot mix plant and mini mobile hot mix plant for your reference.

QLBY-20 mini hot mix plant

Model QLBY-10
Capacity 10t/h
Total Power Fuel Oil 41.5kW
Fuel Coal 57.5kW
Aggregate Batcher 2.3m3*3
Finished Asphalt Storage Bin 2t
Asphalt Temperature 120-180°C (adjustable)
Fuel Consumption Fuel Oil: 5-7.5 kg/t; Fuel Coal: 13-15 kg/t

QLBY-20 mini mobile hot mix plant

Model QLBY-20
Capacity 20t/h
Total Power Fuel Oil 63.5kW
Fuel Coal 86.5kW
Aggregate Batcher 2.3m3*3
Finished Asphalt Storage Bin 5t
Asphalt Temperature 120-180°C (adjustable)
Fuel Consumption Fuel Oil: 5-7.5 kg/t; Fuel Coal: 13-15 kg/t

Convenient Asphalt Plant – – Easy To Install, Move And Disassemble

Convenient asphalt plant means movement. This type plant is equipped with wheels, so it can be transferred freely, in addition, it can be installed or disassembled within one day, if you have many construction sites, this mini mobile asphalt mixing plant will be your ideal choice.

QLBY-30 mobile mini asphalt plant

Model QLBY-30
Capacity 30t/h
Total Power Fuel Oil 104.5kW
Fuel Coal 127.5kW
Aggregate Batcher 5m3*3
Finished Asphalt Storage Bin 9t
Asphalt Temperature 120-180°C (adjustable)
Fuel Consumption Fuel Oil: 5-7.5 kg/t; Fuel Coal: 13-15 kg/t

QLBY-10 mini portable asphalt plant

Model QLBY-10
Capacity 10t/h
Total Power Fuel Oil 41.5kW
Fuel Coal 57.5kW
Aggregate Batcher 2.3m3*3
Finished Asphalt Storage Bin 2t
Asphalt Temperature 120-180°C (adjustable)
Fuel Consumption Fuel Oil: 5-7.5 kg/t; Fuel Coal: 13-15 kg/t

Continuous Drum Type Mix Plant – – High Efficiency

Drum type means asphalt mixing process is conducted in a drum, if you are familiar with asphalt drum mix plant, you will know raw materials will through the drum, in it raw materials will be screened. In mini asphalt drum plant, we adopt continuous mixing production, heat, dry and mix of aggregate are in the same one drum, to some extent, this way can save some land occupation and production period.

QLB-20 mini asphalt drum mix plant

Model Productivity (T/h) Total power (kw) Fuel Consumption(kg/t)
Coal Oil
DHB60 60 99 10 to 13 5.5 to 7

QLBY-10 mobile mini drum mix plant

Model QLBY-20
Capacity 20t/h
Total Power Fuel Oil 63.5kW
Fuel Coal 86.5kW
Aggregate Batcher 2.3m3*3
Finished Asphalt Storage Bin 5t
Asphalt Temperature 120-180°C (adjustable)
Fuel Consumption Fuel Oil: 5-7.5 kg/t; Fuel Coal: 13-15 kg/t

Compulsory Type Mix Plant – – Equipped With JS Series Mixer

Compulsory asphalt batching plant is disposed with JS compulsory mixer, thus, heat and dry of aggregate and mixing of mixture are conducted compulsory periodic. Mini asphalt batching plant will batch asphalt pot by pot, mixing one pot will spend 45s to 60s, productivity depends on type of mini asphalt batching plant.

QLB-30 mini asphalt batching plant

Model Productivity (T/h) Total power (kw) Fuel Consumption(kg/t)
Coal Oil
DHB40 40 58 10 to 13 5.5 to 7

QLBY-20 mini asphalt batch plant

Model QLBY-20
Capacity 20t/h
Total Power Fuel Oil 63.5kW
Fuel Coal 86.5kW
Aggregate Batcher 2.3m3*3
Finished Asphalt Storage Bin 5t
Asphalt Temperature 120-180°C (adjustable)
Fuel Consumption Fuel Oil: 5-7.5 kg/t; Fuel Coal: 13-15 kg/t

How To Choose Right Mini Asphalt Plant For Sale

1. According to scale of construction project, leave message on my website, tell me the scale of your project, we will introduce you the most proper one.

2. According to conditions of auxiliary equipment to ensure the specifications of mini asphalt plant and design dimensions.

3. According to the amounts and quality of asphalt you need, classifications above have clearly tell you features of each type mini asphalt mixing plants, you can choose a tight plant according to the guidance.

4. According to your construction needs, if your asphalt production period is long, you can choose mini stationary asphalt mixing plant, otherwise, you can choose a mini mobile asphalt plant. What’s more, if you have several sites to carry out asphalt production, mobile type mini asphalt plant will be your right choice, you can install it for one project, and disassemble it for another project in another place, which is very convenient, disassemble only needs one day.

Stationary Type Mini Asphalt Mixing Plant

QLB-30 mini stationary mini asphalt mixing plant

Model Productivity (T/h) Total power (kw) Fuel Consumption(kg/t)
Coal Oil
DHB80 80 196 10 to 13 5.5 to 7

QLB-10 mini stationary asphalt mixing plant

Model Productivity (T/h) Total power (kw) Fuel Consumption(kg/t)
Coal Oil
DHB20 20 26 10 5.5 to 7

Somethings You Need To Prepare Before Installation Of Mini Asphalt Plants For Sale

Machines and tools preparation

One 20t truck crane

One set of tools regular used by locksmith

One set of tools regular used by electrician

One theodolite

One set of adjustable spanner

One set of spanner

Two pipe wrench

8 pounds of hammer

4 crowbar

Two sets of wire rope and saddle

A steel tape

6 safety belts

16 hard hats

Two electric welding machines

People needs

One organizer

Two electricians

Two technicians(including one mechanical engineer and one electrical engineer)

Two lifting workers

Two electric welders

One pipe fitter

Ten installers

Other Capacity Asphalt Mixing Plant

QLB-80 asphalt mixing plant sale

Type  LB1000
 Rated production  80t/h
 Cold Aggregate Bin  4×9m3
 Dry Cylinder  1.5m×6m
 Bag-type Dust-collector  CNM357
 Emission Standard  50mg/nm3
 Vibrating Screen  4 layers
 Hot Aggregate Bin  26t
 Mixing Kettle Capacity 1000kg
 Mixing Cycle  45s
 Mineral Powder Tank Volume)  26+36t
 Asphalt Tank Volume  50000L
 Heat Conduction Oil Stove  300,000 kcol/h
 End-product Container Volume  90t
QLB-40 drum asphalt plant
Model Productivity (T/h) Total power (kw) Fuel Consumption(kg/t)
Coal Oil
DHB40 40 58 10-13 5.5 to 7

Check And Inspection Before Installation Of Mini Asphalt Mixing Plant For Sale

1. Basic inspection of mixing plant: check test report of concrete base. After concrete reaches the designed strength, the installation of mixing station can be organized.The horizontal error of the upper surface of concrete station foundation is no more than 0.5 mm. The foundation of concrete station should be 150 mm above the natural ground, and have good drainage measures.

2. Carefully check each part of the mini asphalt mixing plant, including structural welding line, bolts, pin shaft, guide wheel, steel wire rope, hook, lifting device, hydraulic climbing system of hoisting jack and electrical equipment, and timely solve any problems found.

3. Check switch box and power supply line of electrical equipment to ensure safe power supply during operation.

4. Check whether the technical performance of the installation and use of the equipment is good, check whether the safety protective equipment used in the installation meets the requirements, solve the problems immediately, and ensure the safety of the installation and use of the equipment and safety protective equipment.

5. During the installation of the asphalt plant, the site must be kept clean and orderly so as not to affect the safety of the operation.Set up the operation area warning line, and set up a dedicated person to be responsible for vigilance, to prevent irrelevant people from entering the mixing station installation site.

6. The installation of mini asphalt plant must be carried out during the day and avoid rainy, windy and foggy weather. If the weather changes suddenly occur during operation, the operation shall be stopped.

Please feel free to give your inquiry in the form below. We will reply in 24 hours.