Aimix provides our Malaysia client with a powerful trailer concrete pump for their high rise building construction project in Klang. Now the equipment functions well on site and pumps large amount of concrete mixture every days. Please go on reading to learn more.
Client’s Project Goal
Deliver 2,500+ m³ of concrete to a 22-story residential tower within tight deadlines, ensuring uninterrupted pumping to heights of 120+ meters despite Klang’s urban site constraints.
Obstacles Our Client Face
- Space limitations: Narrow access roads and congested staging areas.
- Equipment synergy: Existing concrete mixer truck required seamless integration with pumping systems.
- Vertical challenges: Balancing pump pressure stability with precise slab placement.
Concrete Pumping Solution Design and Implementation
Based on the client’s project requirement, our engineer and project manager recommend the ABT60C trailer concrete pump with a manual placing boom for the following reasons:
- Mobility: Rapid setup/relocation (
- High-pressure pumping: 60 m³/h output at 12 MPa, reaching 22 floors per setup.
- Boom flexibility: Manual boom enabled precise pouring in rebar-dense zones.
- Fuel efficiency: 30% lower diesel consumption vs. standard pumps, reducing costs.
The client agreed with our solution and we delivery these equipment to them.

Positive Result
- 20% faster cycle time: Completed floor slabs every 3 days vs. industry-average 4 days.
- Zero downtime: ABT60C’s 98% uptime kept mixers continuously feeding concrete.
- Cost savings: Reduced labor for boom positioning + lower fuel bills = $15,600 saved/month.
The success of this project improve customer satisfaction and makes them willing to establish long-term cooperative relationships with Aimix.